What is in log house kit?

ECOHOUSEMART offers you a variety of package selections to ensure you can meet your budget and your construction needs. 

Below are three basic packages and you’re automatically assured of getting the most complete laminated log package available. 

Be careful when comparing — all log homes are not created equal. Avoid unpleasant surprises — spend time to know what’s included in your Laminated log house package before you purchase, not on the construction site. We are also ready to provide you with individual package for your specific needs.

Your house kit is made of northern spruce, using highest precision equipment according to approved house project. Once your house kit is manufactured, it is transferred to your construction site where it is assembled quite fast, compared to other traditional house building techniques.

Compare Package Contents:

  Wall package Shell Package Max Package
Wall elements
  • Sill plate board – underlaying board under the starting crown 1,6” х 7,9”
+ + +
  • Strapping beam (with pile-screw foundation)
+ + +
  • Details of the house from glued laminated profiled timber (logs made of engineered wood) with cups according to the house project (Laminated log W; Laminated log H), cutting of material according to the project design, with cutting of the end grooves under the casing bar, with protective finishing of the ends with special protective composition, ready to paint or stain
+ + +
  • An intertwined seal for corner joints of the timber – Rayv Line, Finland
+ + +
  • Glued structural posts – engineered wood 7,9″ х 7,9”
+ + +
  • Key for installing windows and doors – dry planed block 1,2″ x 1,6″
+ + +
  • Casing board for installation of window and door blocks 1,6″ x 7,9″
+ + +
  • Fasteners (a set of fastenings for wall structures)
+ + +
Floor elements      
  • Beams of basement – planed engineered wood (With a strip foundation)
  + +
  • Interstorey floor beams – planed engineered wood
  + +
  • Attic floor joists – planed engineered wood (rafters, if they are in a project)
  + +
  • Framing lumber for exterior decks made of engineered wood (if they are in a project)
  + +
  • Cranial bar – sawn block 1,7″ x 1,2″
  + +
  • Black floor board – sawn board 0,6″
  + +
  • Fasteners (a set of fasteners floor beams)
  + +
Roof elements      
  • Construction of rafter system (rafters) – planed engineered wood
  + +
  • Lathing – sawn board 1″
  + +
  • Grating – sawn bar 1,7″ x 2″
  + +
  • Beacon bar – sawn block 1″ x 2″
  + +
  • Ceiling board – sawn board 0,6″
  + +
  • Fasteners (a set of fasteners for roof elements)
  + +
Frame elements      
  • Elements of external frames (calibrated racks, if applicable by project)
  + +
  • Elements of internal frames (calibrated racks)
  + +
  • Immitation beam for cladding of external log walls – engineered wood (if applicable), Laminated log (H) х 1,65″
  + +
  • Immitation beam for cladding of internal log walls – engineered wood, Laminated log (H) х 1,65″
  + +
Exterior finishing materials      
  • Eaves board – planed glued board 0,8″ x 4,7″
  + +
  • External sheath for filing eaves – planed glued board 0,8″ x 4,7″
  + +
  • Casing board for windows and doors – planed glued board 0,8″ x 4,7″
    +
  • Casing board for the ends of the walls (if applicable by design)
    +
  • Elements of external fences for the terrace
    +
  • Terrace board
    +
Interior Inishing materials      
  • Casing board for windows and doors – planed glued board 0,8″ x 4,7″
    +
  • Casing board for the ends of the walls (if applicable by design)
    +
  • Finishing grooved floor board 1,5″
    +
  • Plinth 1,2″ x 1,6″
    +
  • Tongue and groove ceiling board 0,8″ x 4,7″
    +
  • Plinth ceiling 1″ x 1″
    +
  • lining profiles (if applicable by design)
    +
Options* (offered separately)      
  • Drilled holes for concealed wiring
     
  • Drilled holes for fastening elements (studs, nagels)
     
  • Antiseptic treatment of the wall logs
     
  • Moisture proofing of the wall logs
     
  • Moisture-proof treatment of the components of the house-kits
     
  • Antiseptic treatment of invisible elements of house
     

*These options may be added to any package at additional cost.

Due to differences in personal preferences and requirements, the following items are not included in our packages: foundation, basement support post, windows, doors, any masonry items, plumbing and heating materials, electrical materials, kitchen cabinets or countertops, stains or finishes, roof insulation and roof covering, and miscellaneous items, such as flashing and vents. No labor to assemble included.

Note: Due to differences in personal preferences and requirements, the following items are not included in our packages: foundation, basement support post, any masonry items, plumbing and heating materials, electrical materials, kitchen cabinets or countertops, finish flooring, stains or finishes, roof insulation for log packages, nails, and miscellaneous items, such as flashing and vents.

Where do you plan to build a house?


Your construction plans


YesNoLooking to buy

yesno

Your total house construction budget (excluding cost of land):